Estimating And Costing MCQ's Test No 04


Estimating and Costing MCQ Test & Online Quiz: Below is the Estimating and Costing MCQ test that checks your basic knowledge of Estimating and Costing
Estimating And Costing MCQ's Test No 04


1 Pick up the incorrect statement regarding a master trap from the following: ?




... Answer is D )
Pick up the incorrect statement regarding a master trap from the following is " The water seal is less than that of ordinary traps "

2 The order of booking dimensions is ?




... Answer is A )
The order of booking dimensions is " Length, breadth, height "

3 The detention period in a septic tank is assumed ?




... Answer is C )
The detention period in a septic tank is assumed “30 minutes"

4 height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula is?




... Answer is B )
height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is " 3225 m3 "

5 Pick up the item of work not included in the plinth area estimate ?




... Answer is D )
Pick up the item of work not included in the plinth area estimate is " Courtyard area "

6 The minimum width of a septic tank is taken




... Answer is C )
The minimum width of a septic tank is taken " 75 cm "

7 The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended, is ?




... Answer is B )
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended “150 mm "

8 Pick up the item whose weight is added to the weight of respective item, is ?




... Answer is D )
Pick up the item whose weight is added to the weight of respective item, is " All the above "

9 The unit of measurement is per quintal for the following: ?




... Answer is C )
The expected out turn for earth work in excavation in ordinary soil per workman per day is ” M.S. reinforcement of R.C.C. works "

10 Pick up the incorrect statement from the following: ?




... Answer is D )
Pick up the incorrect statement from the following is “ None of these "