Ticker

6/recent/ticker-posts

Advertisement

Estimating And Costing MCQ'S Test No 1



1 In the mid-section formula ?  A The mean depth is the average of depths of two consecutive sections  B) The area of mid-sections is calculated by using mean depth  C) The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections  D) All of the above ... Answer is D ) In the mid-section formula " All of the above " Show Answer 2 The assumption on which the trapezoidal formula for volumes is based, is ?  A) ) The end sections are parallel planes  B) The mid-area of a pyramid is half the average area of the ends  C) The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied  D) All the above ... Answer is D ) The assumption on which the trapezoidal formula for volumes is based, is is " All the above " Show Answer 3 Pick up the incorrect statement from the following: ?  A) Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil  B) The lead is calculated for each block of the excavated area  C) The unit of lead is 1 km where the lead exceeds 2 km  D) The unit of lead is 50 m for a distance upto 500 m ... Answer is C ) Pick up the incorrect statement from the following is “The unit of lead is 1 km where the lead exceeds 2 km " Show Answer 4 The brick work is not measured in cu m in case of ?  A) ) One or more than one brick wall  B) Half brick wall  C) Reinforced brick work  D) ) Brick work in arches ... Answer is B ) The brick work is not measured in cu m in case of is " Half brick wall " Show Answer 5 Pick up the correct statement from the following ?  A) In order to check up the average depth of excavation, 'Dead man s' are left at the midwidths of borrow pits  The earthwork calculation in excavation is made from the difference in levels obtained with a level  C) The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers  D) All the above ... Answer is D ) Pick up the correct statement from the following is " All the above" Show Answer 6 While estimating the qualities for the construction of a building, the correct metric unit is?  A) Litre for capacity  B) Square metres for volume  C) Cubic metre for area  D) Metre for length ... Answer is A ) While estimating the qualities for the construction of a building, the correct metric unit is " Litre for capacity " Show Answer 7 A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is ?  A 500 m  B) 1000 m3  C) 1500 m3  D) 2000 m3 ... Answer is C ) A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is " 1500 m3 " Show Answer 8 While estimating a reinforced cement structure, the omitted cover of concrete is assumed ?  A) At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar  B) In thin slabs, 12 mm minimum or diameter of the bar whichever is more  C) For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more  D) All the above ... Answer is D ) While estimating a reinforced cement structure, the omitted cover of concrete is assumed is " All the above " Show Answer 9 If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by ?  A) Mid-section formula  B) Trapezoidal formula  C) Prismoidal formula  D) All the above ... Answer is D ) 9 If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by is ” All the above " Show Answer 10 The plinth area of a building not includes ?  A Area of cantilevered porch  B) Lift and wall including landing  C) Internal shaft for sanitary installations up to 2 sq m. in area  D) Area of the walls at the floor level ... Answer is A ) The plinth area of a building not includes is Area of cantilevered porch " Show Answer
Estimating And Costing MCQ'S Test No 1


1 In the mid-section formula ?




... Answer is D )
In the mid-section formula " All of the above "

2 The assumption on which the trapezoidal formula for volumes is based, is ?




... Answer is D )
The assumption on which the trapezoidal formula for volumes is based, is is " All the above "

3 Pick up the incorrect statement from the following: ?




... Answer is C )
Pick up the incorrect statement from the following is “The unit of lead is 1 km where the lead exceeds 2 km "

4 The brick work is not measured in cu m in case of ?




... Answer is B )
The brick work is not measured in cu m in case of is " Half brick wall "

5 Pick up the correct statement from the following ?




... Answer is D )
Pick up the correct statement from the following is " All the above"

6 While estimating the qualities for the construction of a building, the correct metric unit is?




... Answer is A )
While estimating the qualities for the construction of a building, the correct metric unit is " Litre for capacity "

7 A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is ?




... Answer is C )
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is " 1500 m3 "

8 While estimating a reinforced cement structure, the omitted cover of concrete is assumed ?




... Answer is D )
While estimating a reinforced cement structure, the omitted cover of concrete is assumed is " All the above "

9 If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by ?




... Answer is D )
9 If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by is ” All the above "

10 The plinth area of a building not includes ?




... Answer is A )
The plinth area of a building not includes is Area of cantilevered porch "


(if you want to known that what is the civil engineer salaries in the month in 2021 in worldwide the visit to latest Civil Engineer salaries in 2021)