Estimating And Costing MCQ's Test No 03 |
1 Size, capacity and materials need be specified for ?
Size, capacity and materials need be specified for " All of the above "
2 The item of steel work which is measured in sq.m, is ?
The item of steel work which is measured in sq.m, is " All the above "
3 The damp proof course (D.P.C.) is measured in ?
The damp proof course (D.P.C.) is measured in “Sq. m"
4 The volume is measured correct to the nearest ?
The volume is measured correct to the nearest is " 0.01 cum"
5 The brick work is measured in sq metre, in case of ?
The brick work is measured in sq metre, in case of " All the above"
6 The height of the sink of wash basin above floor level is kept
The height of the sink of wash basin above floor level is kept is " 75 cm to 80 cm "
7 For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement
required, is ?
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is “0.274 m3 "
8 Pick up the item whose weight is added to the weight of respective item, is ?
Pick up the item whose weight is added to the weight of respective item, is " All the above "
9 The expected out turn for earth work in excavation in ordinary soil per workman per day is ?
The expected out turn for earth work in excavation in ordinary soil per workman per day is ” 3.00 cum "
10 The expected out turn of brick work in cement mortar in foundation and plinth per mason per day,
Is ?
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, Is “1.25 m3 "