Estimating And Costing MCQ's Test No 2 |
1 The rate of payment is made for 100 cu m (per % cu m) in case of ?
The rate of payment is made for 100 cu m (per % cu m) in case of " All of the above "
2 The main factor to be considered while preparing a detailed estimate, is ?
The main factor to be considered while preparing a detailed estimate, is " All the above "
3 Brick walls are measured in sq. m if the thickness of the wall is ?
Brick walls are measured in sq. m if the thickness of the wall is “ 10 cm "
4 According to Indian Standards Institute, the actual size of modular bricks is ?
According to Indian Standards Institute, the actual size of modular bricks is " 19 cm × 9 cm × 9 cm "
5 The rate of an item of work depends on ?
The rate of an item of work depends on " All the above"
6 The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as ?
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as " Surface excavation "
7 Pick up the excavation where measurements are made in square metres for payment. ?
Pick up the excavation where measurements are made in square metres for payment. “Both (b) and (c) "
8 The cross-sections for a highway is taken at?
The cross-sections for a highway is taken at " All the above "
9 The following item of earth work is not measured separately ?
The following item of earth work is not measured separately ” All the above "
10 The measurement is made in square metre in case of ?
The measurement is made in square metre in case of “None of these "
1 Comments
informative and important mcqs
ReplyDelete