The rate of payment is made for 100 cu m (per % cu m) in case of ?  A Earth work in excavation  B) Rock cutting  C) Excavation in trenches for foundation  D) All of the above ... Answer is D ) The rate of payment is made for 100 cu m (per % cu m) in case of " All of the above " Show Answer 2 The main factor to be considered while preparing a detailed estimate, is ?  A) ) Quantity of the materials  B) Availability of materials  C) Transportation of materials  D) All the above
Estimating And Costing MCQ's Test No 2



1 The rate of payment is made for 100 cu m (per % cu m) in case of ?




... Answer is D )
The rate of payment is made for 100 cu m (per % cu m) in case of " All of the above "

2 The main factor to be considered while preparing a detailed estimate, is ?




... Answer is D )
The main factor to be considered while preparing a detailed estimate, is " All the above "

3 Brick walls are measured in sq. m if the thickness of the wall is ?




... Answer is A )
Brick walls are measured in sq. m if the thickness of the wall is “ 10 cm "

4 According to Indian Standards Institute, the actual size of modular bricks is ?




... Answer is C )
According to Indian Standards Institute, the actual size of modular bricks is " 19 cm × 9 cm × 9 cm "

5 The rate of an item of work depends on ?




... Answer is D )
The rate of an item of work depends on " All the above"

6 The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as ?




... Answer is B )
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as " Surface excavation "

7 Pick up the excavation where measurements are made in square metres for payment. ?




... Answer is D )
Pick up the excavation where measurements are made in square metres for payment. “Both (b) and (c) "

8 The cross-sections for a highway is taken at?




... Answer is D )
The cross-sections for a highway is taken at " All the above "

9 The following item of earth work is not measured separately ?




... Answer is D )
The following item of earth work is not measured separately ” All the above "

10 The measurement is made in square metre in case of ?




... Answer is D )
The measurement is made in square metre in case of “None of these "