Building Construction MCQ's Test NO 1 |
1 The service area in a building means the area occupied by ?
The service area in a building means the area occupied by is " All of the above "
2 Pick up the correct statement from the following: ?
Pick up the correct statement from the following is " All the above "
3 Cast iron piles ?
Cast iron piles is “) Are useful for heavy vertical loads "
4 The form work from the slabs excluding props, can be removed only after ?
The form work from the slabs excluding props, can be removed only after " 4 days "
5 The process of filling hollow spaces of walls before plastering, is known ?
The process of filling hollow spaces of walls before plastering, is known " Dubbing out "
6 The type of arch generally constructed over a wooden lintel or over a flat arch for the purpose of carrying the load of the wall above is
The type of arch generally constructed over a wooden lintel or over a flat arch for the purpose of carrying the load of the wall above is " Relieving arch "
7 The platform at the end of a series of steps, is known as ?
The platform at the end of a series of steps, is known as “0.274 m3 "
8 The pile which supports the load due to friction between pile face and surrounding soil, is generally known as ?
The pile which supports the load due to friction between pile face and surrounding soil, is generally known as is " Friction pile "
9 The type of roof which slopes in two directions with a break in the slope on each side is known as ?
The expected out turn for earth work in excavation in ordinary soil per workman per day is ” Gambrel roof "
10 The inclined surface of an abutment to receive the arch, is known as ?
The inclined surface of an abutment to receive the arch, is known as “ Skew back "