![]() |
Surveying and Levelling MCQS (NO 02) |
1 The 'fix' of a plane table from three known points, is good, if ?
The 'fix' of a plane table from three known points, is good, if is " Middle station is nearest "
2 Deviation of the actual road gradient from the proposed contour gradient uphill side, involves ?
Deviation of the actual road gradient from the proposed contour gradient uphill side, involves is " Excavation on the centre line "
3 The angle of intersection of a contour and a ridge line, is ?
The angle of intersection of a contour and a ridge line, is “90° "
4 Removal of parallax, may be achieved by focusing ?
Removal of parallax, may be achieved by focusing is " The objective and the eye-piece "
5 A back sight ?
A back sight is " All the above"
6 For preparation of a contour plan for a route survey ?
For preparation of a contour plan for a route survey " Vertical control "
7 Geodetic surveying is undertaken ?
Geodetic surveying is undertaken " All the above "
8 A well conditioned triangle has no angle less than ?
A well conditioned triangle has no angle less than " 30° "
9 Ranging in chain survey means ?
9 Ranging in chain survey means ” Establishing an intermediate point on the line "
10 An ideal transition curve is ?
An ideal transition curve is “ Clothoid spiral "
0 Comments